Ready to FlashGates & Access

HaLow Gate Controller

Cycle and timed hold-open relay requests, board-confirmed results, and 30-day control activity over Wi-Fi HaLow.

Request This Use Case
A driveway swing gate partly open at dusk

Overview

Evaluate a two-relay supervisory interface with an MM8108-EKH05 and Relay 2 Click. Gate Control reports output requests and command results; Gate Activity keeps a reviewable record.

Type
Ready to Flash
Application Area
Gates & Access
Adds
Relay 2 Click
History
30-Day History
Alerts
2 built in

How It Works

  1. The API sends an authorized, short-lived command bound to the board boot session.
  2. A local worker drives a 500 ms Cycle pulse or a timed Hold Open request, with mutual exclusion and automatic release.
  3. Board telemetry confirms the result; the server retains activity and derives controller fault and connection-loss release alerts.

What You See on the Dashboard

Live Dashboard

  • Gate Control: relay outputs, hold remaining, and cooldown
  • Controller Diagnostics: readiness, command results, and faults

History

30 days of control-state and command-result changes plus one-minute unchanged readings, with pagination and CSV export

Alerts

  • Controller fault / restored
  • Hold released after MQTT connection loss

Controls

  • Cycle Gate
  • Start Hold Open
  • Release Hold

Hardware You Need

Click boards plug into the evaluation kit’s mikroBUS socket at 3.3 V. The firmware is built for the part numbers listed here.

This Use Case Adds

  • Relay 2 Click MIKROE-2750 Set to 3.3 V; CN1 is Cycle and CN2 is Hold Open.

Every Use Case Starts With

How to Get It

  1. Choose Request This Use CaseTell Pace Wireless about your project. Signed in, your account is attached for you.
  2. Talk it through on a callPace Wireless contacts you to set up a call, then enables the use case on your account.
  3. Install it with HaLow FlasherHaLow Flasher installs it on the kit over USB, and its dashboard opens with your device.

Limits

Use with relay terminals disconnected for evaluation. Relay state does not prove contact continuity, gate position, direction, or movement; field commissioning is separate.

Applications

Home
Evaluate relay requests for a driveway gate interface before field commissioning.
Commercial
Review request timing and command confirmation for a property access prototype.
Industrial
Bench-test a supervisory dry-contact interface and export its control activity.

Bring HaLow Gate Controller to Your Project

Tell Pace Wireless about your project. After a call, Pace Wireless enables it on your account.